How Much Does a Kitchen Remodel Cost in Seattle? 2026 Price Guide
Seattle kitchens cost more than the national averages you will find online, and the reasons are specific: the city's labor rates, SDCI permit review, a housing stock full of 1910s Craftsman bungalows and 1950s ramblers with original wiring and plumbing, and a sales tax that applies to the entire remodel contract. This guide gives the 2026 planning ranges we quote across Seattle, from Ballard and Queen Anne to West Seattle, Wedgwood, Green Lake and Beacon Hill, broken down by scope and by line item, with the Seattle-only factors that move the number, permit rules, timelines and what a kitchen returns at resale. The video above is a Blue Lake kitchen and hardwood-floor project, so you can see the finish level these budgets buy.
The short answer
In 2026, a full kitchen remodel in Seattle (new cabinets, quartz counters, backsplash, lighting, flooring and appliances in roughly the same layout) typically costs $45,000 to $120,000, and most of the Seattle kitchens we build land between $60,000 and $95,000. A pull-and-replace update that keeps the layout and reuses the plumbing and electrical runs $25,000 to $45,000, a cosmetic refresh (painted cabinets, new counters, hardware, lighting and backsplash) runs $12,000 to $30,000, and a custom or open-concept kitchen that removes walls, moves the sink or range and upgrades the electrical service starts around $150,000. Per square foot, published Seattle figures cluster between $150 and $350 for a finished kitchen, with custom work above that. These are planning ranges, not quotes: a fixed, itemized price comes after a free in-home visit.
Seattle kitchen remodel cost by scope, 2026
- Cosmetic refresh: $12,000 to $30,000. Cabinet boxes stay; doors are painted or refaced, new quartz or butcher-block counters go on, plus a tile backsplash, new sink, faucet, hardware, under-cabinet and recessed lighting and paint. No permit needed if nothing moves. Two to three weeks.
- Pull-and-replace update: $25,000 to $45,000. New stock or semi-custom cabinets in the existing footprint, quartz counters, backsplash, new appliances in the same spots, new flooring in the kitchen only. Trade permits for any new circuits. Three to five weeks of construction.
- Full kitchen remodel: $45,000 to $120,000. The most common Seattle project. Semi-custom cabinetry, quartz or stone counters, tile, new flooring that often continues into the dining room, full lighting plan, dedicated circuits for induction or a second oven, new plumbing fixtures, appliance package and minor layout changes such as adding an island or relocating the dishwasher. Six to ten weeks.
- Custom and open-concept kitchens: $150,000 to $300,000+. Load-bearing walls come out, the sink or range moves, the panel is upgraded, custom or inset cabinetry, professional appliance packages, natural stone, and often a new window or door to the yard. Structural engineering, an SDCI building permit and 10 to 16 weeks of construction. Our load-bearing wall removal page and wall removal cost guide cover the structural side.
Other Seattle contractors publish similar tiers for 2026: roughly $18,000 to $35,000 for a cosmetic refresh, $45,000 to $85,000 for a mid-range remodel in the same footprint, $85,000 to $150,000 with layout changes, and $150,000 to $300,000+ for custom work, with hourly rates for skilled trades of $85 to $150. If a bid comes in far below these ranges, read our guide on how to read a remodeling bid before you sign; the missing money is usually in allowances, demolition, electrical or disposal.
Where the money goes in a $70,000 Seattle kitchen
Our job costing and published 2026 Seattle budgets agree on the split. For a $70,000 full remodel before tax, expect roughly:
- Cabinetry: about 30% ($21,000). Semi-custom lines run $180 to $450 per linear foot installed; true custom runs $500 to $1,100. A federal tariff on imported cabinets that took effect in October 2025 has pushed many import lines up, so domestic semi-custom is often the better value this year.
- Labor and installation: about 25% ($17,500). Demolition, framing, drywall, cabinet and counter install, tile, trim, paint and project management.
- Appliances: about 12% ($8,400). A mid-range stainless package; professional ranges and panel-ready refrigerators push this past $15,000.
- Counters and backsplash: about 10% ($7,000). Quartz installed runs $65 to $100 per square foot in Seattle; marble and quartzite sit above that.
- Plumbing and electrical: about 8% ($5,600). New circuits, under-cabinet lighting, a new sink and faucet rough-in, and code-required GFCI and AFCI protection.
- Flooring: about 6% ($4,200). Engineered hardwood or LVP; refinishing original fir or oak is often cheaper and keeps the character of an older Seattle house. See our flooring cost guide.
- Lighting, hardware, design, permits and disposal: about 9% ($6,300).
Five costs that are specific to Seattle
- Sales tax on the whole contract. Washington treats a remodel as a retail construction service, so Seattle's combined sales tax rate (about 10.5% in 2026) applies to labor as well as materials. On a $70,000 contract that is roughly $7,300 that national cost calculators leave out. Eastside cities run a few tenths of a percent lower.
- SDCI permits and review. Replacing cabinets, counters and fixtures in place needs no permit. New circuits and relocated plumbing need electrical and plumbing permits. Moving a wall, enlarging a window or changing the layout needs an SDCI construction permit: smaller non-structural projects can often go through the Subject-to-Field-Inspection path, which SDCI issues with minimal review (sometimes within 48 hours) and charges 40% of the normal plan-review fee, while structural work goes through full plan review. A typical full-kitchen permit package runs about $800 to $2,500, and a stamped structural letter adds $500 to $1,500. Our Washington permit guide and Seattle vs. Eastside permit timeline comparison explain the queues.
- What is inside the walls of a 1910 to 1960 house. Knob-and-tube wiring ($3,000 to $9,000 to replace the affected circuits), galvanized supply lines ($2,000 to $6,000 to repipe the kitchen run), asbestos in old flooring or duct wrap ($1,500 to $5,000 for abatement) and a sagging or rotted subfloor ($1,500 to $4,000) are routine discoveries in Ballard, Wallingford, Columbia City and West Seattle. We carry a 10 to 15% contingency on pre-1970 houses and photograph everything we open.
- Electrical capacity. Many Seattle homes still run on 100-amp service. Induction cooking, a second oven, a heat pump and an EV charger will exceed it, and a 200-amp upgrade during the kitchen remodel is far cheaper than a second project later. Our panel upgrade guide covers costs and Seattle City Light coordination.
- Access and parking. Hillside lots in Queen Anne and Magnolia, alley-only access in Capitol Hill, and street-parking permits for a dumpster all add labor hours. Condo kitchens downtown and in Belltown add HOA rules and elevator scheduling; see our condo and rental renovation cost guide.
Kitchen remodel cost by Seattle neighborhood
Labor and material prices are the same citywide; what changes the price is the house. Queen Anne, Madison Park, Laurelhurst and Magnolia kitchens are larger, usually part of a bigger renovation and skew custom, so $90,000 to $200,000+ is common. Ballard, Fremont, Wallingford, Green Lake and Phinney Ridge Craftsman and bungalow kitchens are small and often opened to the dining room, which puts them at $60,000 to $130,000 once a wall and the old wiring are handled. West Seattle, Wedgwood, View Ridge, Maple Leaf and Northgate mid-century ramblers and split-levels run $45,000 to $100,000, with the main variable being whether the kitchen is opened to the living room. Beacon Hill, Columbia City, Rainier Valley and South Park projects frequently combine a kitchen with a basement finish or ADU, and a standalone kitchen there typically lands at $40,000 to $90,000.
How long does a Seattle kitchen remodel take?
Plan on 3 to 8 weeks of design and selections, 4 to 12 weeks of cabinet lead time that overlaps the permit, then 6 to 10 weeks of construction for a full remodel, 3 to 5 weeks for a pull-and-replace and 10 to 16 weeks when walls move. Door to door, most Seattle kitchens take 3 to 6 months. Our kitchen remodel timeline guide walks through each phase, and most families stay home with a temporary kitchenette as described in our live-in-your-home guide.
Is a kitchen remodel worth it in Seattle?
With Seattle's median home price near $880,000 in 2026, a dated kitchen is the first thing buyers discount. The national Cost vs. Value data for 2026 puts a minor mid-range kitchen remodel at about $28,000 recouping more than 100% at resale, a major mid-range kitchen at about $83,000 recouping roughly half, and an upscale kitchen at about $164,000 recouping about a third, and the Pacific region consistently returns more than the national figures. The practical reading: a well-scoped $45,000 to $90,000 kitchen is the sweet spot for value in Seattle, and the custom tier is justified by how long you plan to stay. If you are weighing a remodel against a move, our remodel-or-move guide runs the numbers.
Seven ways to keep a Seattle kitchen on budget
- Keep the sink, range and refrigerator where they are unless the layout truly fails you.
- Choose domestic semi-custom cabinets and spend the savings on lighting and hardware.
- Refinish original hardwood instead of replacing it.
- Use quartz on the main run and save stone or zellige for a small accent.
- Order appliances the week the design is final; lead times stall more kitchens than labor does.
- If the house is pre-1970, budget a 10 to 15% contingency and have the electrical and plumbing assessed before demolition.
- Get a fixed, itemized price with allowances called out before demolition starts. Our guide to comparing three contractor bids shows what to look for.
Frequently asked questions
What does a small kitchen remodel cost in Seattle?
A galley or small L-shaped kitchen (roughly 70 to 100 square feet) with new cabinets, counters, backsplash, lighting and fixtures in the same layout typically runs $30,000 to $55,000 in Seattle in 2026. A cosmetic refresh of the same kitchen runs $12,000 to $25,000.
How much does it cost to open a kitchen to the living room in Seattle?
Removing a non-bearing wall with nothing inside it adds roughly $3,000 to $6,000 including patching. Removing a load-bearing wall with an engineered LVL beam, stamped calculations, permit and inspections typically adds $6,000 to $15,000 in a single-story house and $15,000 to $30,000 or more in a two-story home or where steel and new footings are needed, on top of the kitchen itself. Our wall removal cost guide has the full breakdown.
Do I need a permit to remodel my kitchen in Seattle?
Not for cabinets, counters, flooring and like-for-like fixture swaps. Yes for new circuits, relocated plumbing, gas work, a moved or removed wall or a changed window opening. SDCI issues the building permit and Seattle City Light coordinates service upgrades; as your general contractor we pull every permit and schedule the inspections.
How much is a kitchen island in Seattle?
An island with cabinets, a quartz top and electrical runs $5,000 to $14,000. Adding a prep sink or dishwasher raises it because the floor has to be opened for plumbing, and in a house with a finished basement below that is simpler than in a slab-on-grade rambler.
Does Blue Lake offer fixed pricing on Seattle kitchens?
Yes. Every kitchen is a fixed-price, itemized contract with a fixed completion date after a free in-home consultation. The number you sign is the number you pay unless you change the scope.
Get a fixed price for your Seattle kitchen
Blue Lake Construction is a licensed Washington general contractor (#BLUELLC760C3) based in Bellevue, remodeling kitchens across Seattle and the Eastside with permits handled in-house. Visit our Seattle kitchen remodeling page or main kitchen remodeling page, see recent kitchen remodeling projects, compare with our Bellevue kitchen cost guide, or request a free design consultation and we will walk your kitchen with you.
Subscribe to our Newsletter!

Subscribe to our Newsletter!

Latest Blog posts
View All

Blue Lake Construction
23.11.2026
9 min.
How Much Does a Condo or Rental-Unit Renovation Cost in Seattle & Bellevue? 2026 Guide
2026 condo and rental-unit renovation costs for Seattle, Bellevue and the Eastside: cosmetic turnover vs landlord-grade full renovation vs gut remodel, line-item prices for cabinets, counters, bathrooms, LVP and paint, HOA approval and insurance rules, SDCI and Bellevue permits, owner-supplied materials vs labor-only bids, rent-cap math and timelines.

Blue Lake Construction
20.11.2026
8 min.
How Much Does a Laundry Room Remodel Cost in Seattle & Bellevue? 2026 Guide
2026 laundry room remodel costs for Seattle, Bellevue and the Eastside: cosmetic refresh vs full remodel, closet-to-laundry conversions, moving the laundry upstairs, line-item prices for plumbing, 240V dryer circuits, venting, cabinets and flooring, Seattle permit rules, timelines and resale value.

Not sure how to start? Get a free consultation.
One of our experts will get back to you as soon as possible.