How Much Does a Whole-Home Remodel Cost in Seattle & the Eastside? 2026 Price Guide

A whole-home remodel is the biggest check most homeowners will ever write for their house, and the online numbers are all over the map. This guide gives you the 2026 ranges we actually quote in Seattle, Bellevue, Kirkland, Redmond, Sammamish, Issaquah, Renton, Mercer Island and Kent, organized by scope so you can find your project, plus the factors that move the price and how investor flips are scoped differently from a forever-home renovation. The video above is a full house remodel we completed in Sammamish — new kitchen, hardwood floors, rebuilt stairs, opened-up walls, a remodeled bathroom and new exterior hardscape.

The short answer

Published 2026 figures for design-build whole-home remodels in Seattle run roughly $250 to $450 per square foot, well above the national range of about $200 to $300, because of local labor rates, permit requirements and the age of the housing stock. That figure describes a full remodel — kitchen, every bathroom, systems and finishes. A cosmetic whole-home refresh costs a fraction of it. The tiers below are how we scope real projects.

2026 whole-home remodel cost by scope tier

  • Cosmetic refresh: about $60–$120 per square foot. Paint, flooring, counters, fixtures, lighting, doors and hardware throughout, with no layout changes and no major systems work. A 1,800 sq ft rambler lands around $110,000–$215,000. This is how most investor flips are scoped first.
  • Mid-range whole-home remodel: about $150–$275 per square foot. New kitchen, remodeled bathrooms, new flooring and paint, updated lighting and some electrical and plumbing upgrades, with one or two walls opened. For 1,800 sq ft expect roughly $270,000–$495,000.
  • Full gut remodel: about $250–$450 per square foot. Down to the studs in most rooms: new kitchen and baths, full rewire and repipe, new HVAC, insulation, windows, structural changes and high-end finishes. For 1,800 sq ft that is roughly $450,000–$810,000, which is why many Seattle-area full remodels are quoted in the $600,000–$900,000 range.
  • Remodel plus addition or second story. New square footage adds $350–$550 per square foot on top of the remodel; see our home addition cost guide.

Single-room budgets are in our kitchen, bathroom and basement guides; a whole-home project is usually a little cheaper per room than doing those rooms one at a time because mobilization, permits and trades are shared.

What drives the price in the Seattle market

  • Structural work. Removing load-bearing walls, adding beams, foundation repair or seismic retrofits add engineering and inspections. Our structural remodeling page explains what an open-concept conversion involves.
  • Old systems. Knob-and-tube or aluminum wiring, galvanized plumbing, 100-amp panels and oil or old gas furnaces are common in Seattle's pre-1980 homes. Replacing them is unglamorous and often the best money you spend; our order-of-operations guide explains why systems come before finishes.
  • The envelope. Windows, siding, roofing and insulation are frequently folded into a whole-home scope; each is priced in its own guide, from windows to siding and roofing.
  • Finish level. Cabinetry, stone and tile selections can swing a full remodel by 20–30% with no change in scope.
  • Permits and review time. Seattle SDCI review is slower than most Eastside cities and structural changes add engineering review; our permit timeline guide compares them.
  • Living in the house. Phasing the work so you can stay adds time and some cost; moving out is faster. Our live-in guide covers when each makes sense.

How investor flips are scoped differently

A flip is priced backward from the resale target. We start with a cosmetic refresh, then add only the items the comps demand — typically a kitchen, primary bath, flooring, paint and curb appeal — and fix anything an inspector will flag. The goal is the highest return per dollar on a fixed schedule tied to the listing date, not the nicest house on the block. Our house-flipping tips and whole-home remodel and flip page go deeper.

How long does a whole-home remodel take?

Design and selections take 4–8 weeks. Permit review runs about 2–8 weeks in most Eastside cities and longer in Seattle when structural changes or additions are involved. Construction for a typical whole-home interior remodel runs 3–6 months; projects with additions, second stories or foundation work run 6–9 months or more. Cosmetic flips move much faster — often 4–10 weeks once materials are on site.

How to get a reliable number

  1. Decide the tier first — refresh, mid-range or gut — before you shop finishes.
  2. Have the house assessed for systems and structure so surprises become line items, not change orders.
  3. Get bids with the same scope and compare them line by line; our guide to comparing three contractor bids shows how.
  4. Insist on a fixed, itemized price with allowances called out, and a fixed schedule.

Frequently asked questions

Is it cheaper to remodel the whole house or to move?

In Bellevue and much of the Eastside, selling and buying costs alone can run well into six figures once commissions, excise tax and the price gap are counted, which is why many homeowners remodel instead. Our remodel-or-move guide has a simple framework.

Can a whole-home remodel be done in phases?

Yes, and the sequence matters: envelope and systems first, kitchens and bathrooms last. A plan drawn once and built in phases keeps each phase from undoing the previous one.

Does Blue Lake offer fixed pricing on whole-home remodels?

Yes. Every whole-home remodel and flip is a fixed-price, itemized contract with a fixed duration after a free on-site consultation.

Plan your whole-home remodel

Blue Lake Construction is a licensed Washington general contractor (#BLUELLC760C3) based in Bellevue, remodeling whole homes and investor properties across Seattle and the Eastside on fixed-price contracts. See our whole-home remodeling page, the city pages for Seattle and Bellevue, or request a free consultation.

Subscribe to our Newsletter!

Modern kitchen with white marble countertop, wooden stools, and hexagonal tile backsplash.

Subscribe to our Newsletter!

Modern kitchen with white marble countertop, wooden stools, and hexagonal tile backsplash.

Latest Blog posts

View All

Covered wooden patio with dining table, chairs and grilling area built against a brick wall

Blue Lake Construction

13.11.2026

6 min.

How Much Does an Outdoor Kitchen Cost in Seattle? 2026 Price Guide

What outdoor kitchens and outdoor living spaces cost in Seattle and the Eastside in 2026 — installed prices for prefab and custom builds, counters and appliances, gas and electrical permits, covered patios, and how to plan the build season.

Black metal electric driveway gate with stone pillars and motorized gate openers installed by Blue Lake Construction in the Seattle area.

Blue Lake Construction

13.11.2026

6 min.

How Much Does an Electric Driveway Gate Cost in Seattle? 2026 Price Guide

What electric and automatic driveway gates cost in Seattle and the Eastside in 2026 — installed prices by gate type and material, opener and access-control costs, trenching and power, Washington electrical, fence-height and fire-access rules, and swing vs. sliding for sloped driveways.

Modern kitchen with wooden cabinets, black accents, glassware display, green bar stool, and countertop with vase and bowl.

Not sure how to start? Get a free consultation.

One of our experts will get back to you as soon as possible.