"We want to add a primary suite with its own bathroom" is the single most common addition request we hear from homeowners in Seattle, Bellevue, Kirkland and Redmond, and "should we just go up instead?" is the question that follows it. This guide gives you the 2026 planning numbers for both: a ground-floor primary suite addition and a partial or full second-story addition, what drives the price in the Seattle market, what permits and engineering add, how long each takes and what you can expect back at resale. The video above is a whole-house remodel in Everett where we added a new room to the existing footprint.
The short answer
In 2026, a ground-floor primary suite addition of about 350 to 450 square feet with a full bathroom typically costs $150,000 to $320,000 in Seattle and on the Eastside, or roughly $400 to $650 per square foot all-in. A partial second-story addition (a suite or two bedrooms over part of the house) runs about $400 to $600 per square foot, typically $200,000 to $450,000. A full second story over the whole footprint runs about $350 to $550 per square foot, so $350,000 to $600,000 and up; some Seattle design-build firms quote $700 to $900 per square foot for complex second stories on older homes. Published Seattle-area guides and recent King County bids land in the same bands, and these are planning ranges, not quotes: a fixed, itemized price comes after a site visit.
Primary suite addition cost in 2026
- Basic finishes: $140,000 to $175,000. Standard tile, a prefab or simple tiled shower, stock vanity, carpet or LVP, and the new bath placed on an existing wet wall. Around $350 to $440 per square foot.
- Mid-range: $180,000 to $240,000. Walk-in closet, double vanity, curbless tiled shower, hardwood or engineered flooring, upgraded lighting and a mini-split for heating and cooling. Around $450 to $550 per square foot.
- High-end: $250,000 to $320,000+. Freestanding tub plus large shower, heated floors, custom closet system, vaulted ceiling, oversized windows or a slider to a new deck. Around $550 to $700 per square foot.
The bathroom is the expensive room inside the addition: plan on $25,000 to $40,000 for the bath when it shares an existing plumbing wall, and $8,000 to $15,000 more when supply and drain lines have to be run across the house. Our bathroom cost guide breaks that part down.
Second-story addition cost in 2026
- Partial second story (400 to 700 sq ft): $200,000 to $450,000. Usually a primary suite or two bedrooms and a bath over a garage or one wing of the house.
- Full second story (1,000 to 1,500 sq ft): $350,000 to $600,000+. The whole roof comes off; the house gets a new roof structure, new stairs, upgraded electrical service and often a new HVAC layout.
- Foundation and structural upgrades: $30,000 to $100,000. Most Seattle-area ramblers and split-levels were not engineered to carry a second floor. Expect footing enlargement, new bearing walls or steel, and shear-wall and hold-down work for seismic code. Our foundation repair page and structural remodeling page explain what that involves.
- Living arrangements. A full second story usually means moving out for part of the build, which belongs in the budget; see our guide to living at home during a remodel.
Going up is the right call when the lot is small, setbacks or lot coverage block a ground-floor addition, or you want to keep the yard. Going out is cheaper per square foot and far less disruptive when the lot allows it. If the goal is rental income or a space for family, compare both with a detached unit in our basement vs. addition vs. ADU guide.
What is included in those numbers
- Design and engineering. Architectural plans run about 8 to 15 percent of construction cost at percentage-fee firms; structural engineering adds $4,000 to $12,000. On a design-build contract these are folded into one price; our design-build vs. architect guide compares the two routes.
- Permits. Building, electrical, plumbing and mechanical permits for an addition typically total $8,000 to $15,000 in Seattle and the Eastside, or roughly 1.5 to 2.5 percent of the project valuation. Plan review runs about 6 to 12 weeks, longer in Seattle than in most Eastside cities; see Seattle vs. Eastside permit timelines.
- Systems. A new suite often triggers a 200-amp panel upgrade, a water-heater upsizing or a mini-split, which is why we price plumbing and electrical as line items rather than allowances.
- Tie-in work. Matching siding, roofing and flooring where new meets old, patching the existing exterior, and restoring landscaping and hardscape.
- Contingency. Carry at least 10 to 15 percent for conditions uncovered once walls and soil are open, especially in pre-1980 homes.
Typical ranges by city
Published 2026 Eastside and Seattle addition ranges cluster as follows for a bedroom-and-bath scale project: Bellevue $150,000 to $400,000+, Mercer Island $180,000 to $500,000, Kirkland $140,000 to $320,000, Sammamish $150,000 to $350,000, Redmond and Issaquah $130,000 to $300,000, Seattle $150,000 to $350,000, Renton and Newcastle $120,000 to $275,000. The spread is driven by lot conditions, finish level and the age of the house more than by the city itself. See our Bellevue and Seattle remodeling pages for local project examples.
How long does an addition take?
For a primary suite addition, plan on 3 to 5 months of design, engineering and permitting, then 4 to 6 months of construction, so 8 to 12 months from first meeting to move-in. A second-story addition is similar on the front end but construction runs 6 to 9 months, with the roof-off phase scheduled for the driest window possible. Booking design work in winter positions the build for the spring and summer construction season.
Is a primary suite addition worth it at resale?
National surveys put resale recovery for a primary suite addition near 48 to 60 percent, and Seattle-area estimates range from about 50 to 70 percent depending on neighborhood, with the strongest returns in areas where three-bedroom, two-bath homes are the norm and a suite moves the house into a higher price bracket. The rest of the value is the years you live in it. If staying put long-term is the plan, our aging-in-place guide covers the details that make a ground-floor suite work for decades, and our remodel-or-move guide compares an addition with trading up.
How to budget for a primary suite or second story
- Confirm what your lot allows: setbacks, lot coverage, height limits and tree protection decide whether you can go out, up, or both.
- Decide the finish tier before you shop fixtures; it moves the price 30 percent or more at the same square footage.
- Have the foundation and framing assessed early so structural upgrades are line items, not change orders.
- Get fixed, itemized bids with the same scope and compare them side by side; our guide to comparing contractor bids shows how.
- Verify the contractor's Washington license, bond and insurance; our guide on what a general contractor does explains what to check.
Frequently asked questions
How much does it cost to add a bedroom and bathroom in Seattle?
A 350 to 450 square foot bedroom-and-bath addition typically costs $150,000 to $320,000 in Seattle and on the Eastside in 2026, roughly $400 to $650 per square foot, depending on finish level, plumbing distance and site conditions.
Is it cheaper to add a second story or build out?
Building out on the ground floor is usually cheaper per square foot and far less disruptive, because a second story adds roof removal, structural reinforcement, new stairs and often temporary housing. A second story wins when the lot is small or setbacks prevent expanding the footprint.
Do I need a permit for a primary suite addition in Bellevue or Seattle?
Yes. Any addition needs a building permit with plan review plus electrical, plumbing and mechanical permits, and structural engineering stamped by a Washington engineer. Our permits guide explains the process.
Does Blue Lake offer fixed pricing on additions?
Yes. Every addition is a fixed-price, itemized contract with a fixed schedule after a free on-site consultation, with design, engineering, permits and construction managed by one project manager.
Plan your addition
Blue Lake Construction is a licensed Washington general contractor (#BLUELLC760C3) based in Bellevue, building primary suites, second stories and room additions across Seattle, Bellevue, Kirkland, Redmond, Sammamish, Issaquah, Mercer Island, Renton and Kent. See our home additions page, read the broader home addition cost guide, or request a free consultation.
Subscribe to our Newsletter!

Subscribe to our Newsletter!

Latest Blog posts
View All

Blue Lake Construction
16.11.2026
9 min.
How Much Does It Cost to Build a House in Seattle & the Eastside? 2026 Guide
What it costs to build a new custom home in Seattle, Bellevue and the Eastside in 2026 — cost per square foot, worked totals by home size, lot and site costs, permit fees and timelines, and how a teardown-rebuild compares to remodeling.

Blue Lake Construction
16.11.2026
9 min.
How Much Does a Whole-Home Remodel Cost in Seattle & the Eastside? 2026 Price Guide
What a whole-home remodel costs in Seattle, Bellevue and the Eastside in 2026 — cost per square foot by scope tier, worked totals for typical homes, what drives the price, permits, timelines and how investor flips are scoped differently.

Not sure how to start? Get a free consultation.
One of our experts will get back to you as soon as possible.